Tags: HOT START UP AFBC BOILER, light up of afbc boiler, WARM In this article we discussed about the AFBC boiler hot startup and cold. The start up of fluidised bed combustion boilers has always been a subject of the most surface, it is advised not to proceed with the light up. Unless the top. Requirements of Bed material,Charcoal & Diesel. Bed material Maximum Particle size Bulk density Chemical composition MM TO

Author: Shagis Tekus
Country: Cambodia
Language: English (Spanish)
Genre: Science
Published (Last): 6 July 2018
Pages: 285
PDF File Size: 8.71 Mb
ePub File Size: 14.46 Mb
ISBN: 553-6-15306-300-2
Downloads: 66654
Price: Free* [*Free Regsitration Required]
Uploader: Kajilrajas

Bed material Maximum Particle size Bulk density Chemical composition: Cethar Afbc Boiler Manual – dire searching for a ebook Cethar afbc boiler manual in Start up vent valve.

When the bed temperatures reaches Deg C start the drag chain coal feeder. Afbc Boiler Operation Manual – boiler operation manual at C and start the ash handling system. Afbc Boiler Operation Manual – snowman-ro. Add gas plenum pressure P2 Furnace draught to P1.

Inspect the boiler before start and check Manual on Boiler Tube Bhel steam generators products afbc boilers Tags: Boiler Installation – Afbc Documents. Set the air flow to MM of wc P.

Drum and main line vent. Start the FD fan and maintain bed pressure mmwc. Light up all the four burners. Maintain drum level at normal recommended level. Ensure all equipment trial to be taken. Main steam stop and pilot valve. CFBC boiler lighf procedure?

  LES SAYANIM PDF

Turn off the oil burners and remove from furnace. Cfbc boiler operation procedure? The pressure drop across bed is obtained for various air flow. Bed material to be filled and level boilerr defluidised bed should be MM of WC. Afbc Boiler Operation Manual – ante-annum. Ensure feed water flow lgiht economiser at the time of light up to avoid steaming of economiser. Ensure the deaerator water level as normal.

Valves on feed line connecting to feed pumps operation. Check the bed material and fludisation study is being done.

AFBC BOILER LIGHT UP Archives – ASKPOWERPLANT

Once fludisation study is completed boiler is ready for light up. A fixed quantity of diesel wetted Charcoal 40 Kgs is spread uniformly over the compartment.

After stabilisation of bed temperatures stop the burners and LDO pumps. Cfbc Boiler s,ebooks and documents of cfbc boiler operation manual thermax – afbc boilers, Check for dry fuel MM is available in bunker and gates below bunker are open and fuel is available at feeder inlet. Initally the top bed affbc will raise and at the time of mixing temperature drops and bottom temperature raises at the time of mixing.

  DALAILUL KHAYRAT ARABIC PDF

Inspect the boiler before start and check Manual on Boiler Tube Fluidized bed combustion – wikipedia, the free encyclopedia Fluidized bed combustion FBC is a combustion technology used to burn solid fuels. Afbc Boiler Operation Manual – boiler operation procedure 1 seminar afbc boiler operation procedure,Ask Latest information,Abstract,Report,Presentation free download cfbc Documents. Bed super heater drains.

Ensure all access doors are closed. Drain valves of water level gauge.

Inspect the boiler before start and check the following 1. Check the following valves are kept in open condition. Check instrument air pressure is available at the required pressure 7 to 7.

Afbc Boiler Light Up Procedure

Shiatsu Massage Manual Afbc boiler boiler, The The air flow at afbd fludisation starts is noted and will be maintained at the time of mixing. Check the following equipments for adequate lubrication. Valves before and after feed control valve in feed line. Start the LD oil pump and maintain the oil pressure between 6.